Complete stripping out of internal fixtures and fittings, demolishing internal walls and partitions and replacing with new blockwork and stud partitions and installing new specialist glazed partitions and suspended ceilings, together with full replacement of the mechanical and electrical installations. The project also included the formation of a new entrance including a new glazed canopy and the forming of a new raised planters and paths.
Client :: The University of Salford
Contract :: 23 weeks
Value :: £800,000
Equestrian Teams will use the facility in preparation for and during the Olympic games 2012. Demolition of existing stables and out buildings was required prior to the design and construction of new Indoor and Outdoor Arenas, new American Barn including some alterations to existing buildings and extensive external hard standing areas and landscaping.
Client :: Reaseheath College
Contract :: 30 weeks
Value :: £1,600,000
A single storey twin mono pitched new build extension, together with internal refurbishment of courtrooms and offices and the installation and commissioning of new lifts within the existing building. The new superstructure works comprised traditional tiled roofs on pre-manufactured structural timber trusses and "Glulam" beams, with external brickwork to match existing.
Client :: Her Majesty's Courts Service
Contract :: 29 weeks
Value :: £1,300,000
Construction and fitting out of a new single storey school hall with associated external works. The project involved the demolition of existing out buildings and the erection of a steel framed hall on piled foundations, with traditional facing brickwork and timber cladding externally.
Client :: Manchester Diocesan Board of Education
Contract :: 20 weeks
Value :: £385,000
The school was fully occupied throughout the construction of a single storey two classroom extension to the existing school, in facing brickwork and stonework with a traditional slate tiled roof, all to match the existing listed building.
Client :: Manchester Diocesan Board of Education
Contract :: 18 weeks
Value :: £270,000
The project was carried out within the confines of a busy general hospital, which had to be fully operational throughout the course of the contract. Complete stripping out was required along with comprehensive reconfiguration of the existing wards and the construction of a new single storey extension in traditional load bearing brickwork and tiled roof.
Client :: Pennine Care NHS Trust
Contract :: 22 weeks
Value :: £700,000
Refurbishment of existing retail unit, comprising removal of the existing façade and replacing with full height curtain wall glazing, taking out existing staircase and escalators and the construction of a sky lobby incorporating a new staircase, escalator and passenger lift. The works were carried out in a busy, pedestrian only shopping precinct.
Client :: Merepark PLC
Contract :: 16 weeks
Value :: £475,000
Installation of a structural steel mezzanine floor in an existing storage area in W302 Hangar, within BAE Systems secure aircraft assembly units. Because of the nature of the client’s operations strict controls were in place throughout the contract on all operations such as the use of tools and equipment, hot works and control of dust and fumes from construction operations.
Client :: BAE Systems Limited
Contract :: 12 weeks
Value :: £140,000
The contract involved extensive refurbishment works, including stripping out existing offices, toilets and reception area and installing new partitions, ceilings, floor coverings, decorations, modifying existing electrical and mechanical installation and formation of a new reception counter.
Client :: Pennine Care NHS Trust
Contract :: 7 weeks
Value :: £500,000
Refurbishment over three floors to the University of Central Lancashire Pharmacy Department involving stripping out of internal fixtures and fittings, demolishing internal walls and partitions and replacing with new blockwork and stud partitions, installation of new floor, wall and ceiling finishes, new specialist furniture and installation of new small power, data, lighting and fire detection equipment.
Client :: The University of Central Lancashire
Contract :: 15 weeks
Value :: £800,000
Extensive internal refurbishment of the existing food preparation building to form an IT teaching facility, including new mechanical, electrical, IT and Data installations and the construction of a new single storey extension and formation of new main entrance.
Client :: Reaseheath College
Contract :: 16 weeks
Value :: £550,000